Minutes for 0086: EVB LTV

Standard: 802.1Qbg-2012 Clause: Annex D.2.13 Draft with fix: 802.1Q-REV Status: Published
Submitter: Date: 2013-01-09 Rationale:
Date Meeting Text Status
2013-01-15 Jan 2013 Interim Agreed. This was already discussed on the mailing list and the resolution is consistent with that discussion. Target for 802.1Q-REV Ready for Ballot
2013-03-19 Mar 2013 Plenary Q-REV draft prepared. Ready for WG ballot Ready for Ballot
2013-05-15 May 2013 Interim Included in 802.1Q-REV D1.0, in ballot Balloting
2013-07-15 Jul 2013 Plenary 802.1Q-REV D1.2 is balloting Balloting
2013-09-03 Sep 2013 Interim 802.1Q-REV is in WG ballot recirc Balloting
2013-11-12 Nov 2013 Plenary 802.1Q-REV is in WG ballot recirc Balloting
2014-01-22 Jan 2014 Plenary 802.1Q-REV is in sponsor ballot Balloting
2014-03-18 Mar 2014 Plenary 802.1Q-REV is in sponsor ballot recirc Balloting
2014-05-14 May 2014 Interim 802.1Q-REV is in sponsor ballot recirc Balloting
2014-07-15 Jul 2014 Plenary 802.1Q-REV is in sponsor ballot recirc Balloting

Back