2013-01-15 |
Jan 2013 Interim |
Technical review -- discuss on DCB conference call before next meeting
It seems like converting consistently to Tries is the smaller change rather than converting the state machine and MIB to Retries. The EVB TLV could change to maxTries with a 0 value to 8 tries. Alternately, we could leave the EVB TLV maxRetries and use maxTries internally by adding some statements in D.2. |
Technical experts review |
|
2013-03-19 |
Mar 2013 Plenary |
Agree with resolutions 2-5, but do not change state machine as suggested. Instead simply change the following aspects
ackTimer = = 0 && (retries < maxRetries) to ackTimer = = 0 && (retries <= maxRetries)
ackTimer = = 0 && (retries = = maxRetries) to ackTimer = = 0 && (retries > maxRetries)
Paul Bottorff will provide revised state machine and detailed object changes.
Target for 802.1Qrev
|
Complete then Ballot |
|
2013-05-15 |
May 2013 Interim |
Paul Bottorff provided detailed state machine and detailed object changes for the editor as a part of a ballot comment on 802.1Q-REV D1.0
Editor will include in draft and send for another Task Group ballot for review
Target for 801.Q-REV
|
Ready for Ballot |
|
2013-07-15 |
Jul 2013 Plenary |
Included in 802.1Q-REV D1.2 that is in balloting |
Ready for Ballot |
|
2013-09-03 |
Sep 2013 Interim |
802.1Q-REV is in WG ballot recirc |
Balloting |
|
2013-11-12 |
Nov 2013 Plenary |
802.1Q-REV is in WG ballot recirc |
Balloting |
|
2014-01-22 |
Jan 2014 Plenary |
802.1Q-REV is in sponsor ballot |
Balloting |
|
2014-03-18 |
Mar 2014 Plenary |
802.1Q-REV is in sponsor ballot recirc |
Balloting |
|
2014-05-14 |
May 2014 Interim |
802.1Q-REV is in sponsor ballot recirc |
Balloting |
|
2014-07-15 |
Jul 2014 Plenary |
802.1Q-REV is in sponsor ballot recirc |
Balloting |
|